Document Overview
Document Overview This article summarizes the official FCC Supplier’s Declaration of Conformity (SDoC) test report for the ETENWOLF Air3 Portable Air Pump. The document is a formal electromagnetic compatibility (EMC) test report issued under the reference number WTH25H05129164E, prepared in accordance with FCC CFR 47…
- Document type
- Certification Report
- Prepared by
- Michelle Torres
- Published
- Last reviewed
- Topics
- North America: FCC / UL
Document Overview
This article summarizes the official FCC Supplier’s Declaration of Conformity (SDoC) test report for the ETENWOLF Air3 Portable Air Pump. The document is a formal electromagnetic compatibility (EMC) test report issued under the reference number WTH25H05129164E, prepared in accordance with FCC CFR 47 Part 15 Subpart B.
- Document Type: FCC SDoC Test Report
- Reference Number: WTH25H05129164E
- Test Report Form: TRF FCC CFR 47 Part 15 Subpart B-EMC-001-V01
- Internal Form Code: HCT/RF-23-21
- Issuing Laboratory: Waltek Testing Group HCT (Shenzhen) Co., Ltd.
- Date of Issue: 2025-06-04
- Overall Test Result: PASS
- Scope: Conducted emission and radiated emission compliance verification for an unintentional radiator device intended for the United States market under FCC Part 15 Subpart B rules.
The report was prepared by Snow Zeng and approved by Tony Wu at Waltek Testing Group HCT (Shenzhen) Co., Ltd., located at Building B, Tianji Industrial Park, 1/F., 2/F. & 3/F., No. 30-9, Laiyin Road, Xinsheng Community, Longgang Subdistrict, Longgang District, Shenzhen, Guangdong, China.
Product Information
The Equipment Under Test (EUT) assessed in this report is the ETENWOLF Air3, a portable air pump designed for consumer and professional inflation applications.
| Field | Details |
|---|---|
| Product Name | Portable Air Pump |
| Brand / Trade Mark | ETENWOLF (Applicant: Guangdong Bestek Technology Co., Ltd.) |
| Model Number | Air3 |
| Applicant | Guangdong Bestek Technology Co., Ltd. |
| Applicant Address | No. 1, North Gaopu 8th Road, Yuancheng Industrial Park, Heyuan City, Guangdong, P.R. China |
| Manufacturer | Guangdong Bestek Technology Co., Ltd. |
| Manufacturer Address | No. 1, North Gaopu 8th Road, Yuancheng Industrial Park, Heyuan City, Guangdong, P.R. China |
| Device Category | Unintentional Radiator |
| Operating Mode | Mode 1: Charging / Pumping (as described in EUT section) |
The Air3 is a compact, rechargeable portable air pump suited for inflating tires, sports equipment, and other inflatables. As an unintentional radiator, it is subject to FCC Part 15 Subpart B emission limits to ensure it does not cause harmful interference to other electronic devices or radio services.
Key Details
The test report covers two primary EMC measurement disciplines: Conducted Emission and Radiated Emission. Both test campaigns returned passing results against the applicable FCC limits.
Test Timeline
| Event | Date |
|---|---|
| Sample Receipt | 2025-05-27 |
| Testing Period | 2025-05-27 to 2025-05-29 |
| Report Issue Date | 2025-06-04 |
Test Disciplines and Results
| Test Section | Test Type | Standard Reference | Result |
|---|---|---|---|
| Section 3 | Conducted Emission | FCC CFR 47 Part 15 Subpart B | PASS |
| Section 4 | Radiated Emission | FCC CFR 47 Part 15 Subpart B | PASS |
Report Structure Summary
- Section 1 – General Information: EUT description, test standards, test summary, methodology, facility details, and version information.
- Section 2 – System Test Configuration: Test justification, EUT exercise software, equipment modifications, basic configuration, auxiliary equipment descriptions, and decision rule application.
- Section 3 – Conducted Emission: Measurement uncertainty, emission limits, EUT setup, instrument setup, test procedure, equipment list, and test data (covering frequency ranges relevant to Part 15 Subpart B).
- Section 4 – Radiated Emission: Measurement uncertainty, emission limits, EUT setup, test receiver setup, test procedure, corrected amplitude and margin calculations, equipment list, and test data.
- Appendix A – EUT Photographs: Visual documentation of the Air3 unit under test.
- Appendix B – Test Setup Photographs: Documentation of the test environment and equipment configuration.
Decision rules were applied in accordance with standard EMC testing practice, with measurement uncertainty accounted for in the margin calculations documented in Sections 3 and 4 of the full report.
Standards & Compliance
The ETENWOLF Air3 was evaluated against the following regulatory standard:
| Standard | Full Title | Applicability |
|---|---|---|
| FCC CFR 47 Part 15 Subpart B | Federal Communications Commission – Code of Federal Regulations Title 47, Part 15, Subpart B: Unintentional Radiators | Conducted and radiated emission limits for unintentional digital/electronic devices sold in the United States |
Test Methods Applied
- Conducted Emission Measurement: Performed using a Line Impedance Stabilization Network (LISN) to measure RF voltages on the power supply lines, comparing results against the FCC Part 15 Subpart B conducted emission limits across the applicable frequency range.
- Radiated Emission Measurement: Performed in a qualified test facility (semi-anechoic chamber or equivalent open-area test site) measuring electric field strength at the required distances and comparing against the FCC Part 15 Subpart B radiated emission limits.
- Measurement Uncertainty: Documented in Sections 3.1 and 4.1 of the report, applied per standard EMC uncertainty methodology to ensure conservative pass/fail determination.
- Decision Rule: Applied as documented in Section 2.6 of the report, consistent with FCC acceptance criteria for SDoC filings.
The FCC SDoC pathway allows responsible parties (in this case Guangdong Bestek Technology Co., Ltd.) to self-declare conformity after successful completion of accredited third-party testing, without requiring direct FCC filing of the test report. The report is retained by the responsible party and made available upon request by the FCC.
Validity & Certification Body
Testing Laboratory
| Field | Details |
|---|---|
| Laboratory Name | Waltek Testing Group HCT (Shenzhen) Co., Ltd. |
| Laboratory Address | Building B, Tianji Industrial Park, 1/F., 2/F. & 3/F., No. 30-9, Laiyin Road, Xinsheng Community, Longgang Subdistrict, Longgang District, Shenzhen, Guangdong, China |
| Telephone | 0755-84616666 |
| Service Hotline | 400-0066-989 |
| [email protected] | |
| Website Reference | http://www.hct-test.com |
| Prepared By | Snow Zeng |
| Approved By | Tony Wu |
Report Validity
- Report Issue Date: 2025-06-04
- Reference Number: WTH25H05129164E (to be quoted in all correspondence related to this certification)
- Validity Scope: This report is valid for the specific model Air3 as manufactured by Guangdong Bestek Technology Co., Ltd. Any hardware, firmware, or design changes to the product may require re-testing.
- Market Applicability: United States (FCC jurisdiction). The SDoC declaration based on this report permits the Air3 to be legally marketed and sold in the US under FCC Part 15 Subpart B as an unintentional radiator.
- Document Control: The report is 26 pages in total and was issued under internal form HCT/RF-23-21 using Test Report Form TRF FCC CFR 47 Part 15 Subpart B-EMC-001-V01.
Frequently Asked Questions
- What does FCC SDoC mean for the ETENWOLF Air3?
-
FCC SDoC stands for Supplier’s Declaration of Conformity. It means the manufacturer or responsible party has tested the Air3 through an accredited laboratory and confirmed it meets FCC CFR 47 Part 15 Subpart B emission limits. The product does not require a separate FCC ID but must carry the appropriate SDoC compliance statement. This allows the Air3 to be legally sold and used in the United States without causing harmful radio frequency interference.
- What tests were performed on the Air3, and did it pass?
-
The Air3 underwent two categories of EMC testing: Conducted Emission (Section 3 of the report) and Radiated Emission (Section 4 of the report), both performed at Waltek Testing Group HCT (Shenzhen) Co., Ltd. between 2025-05-27 and 2025-05-29. Both tests returned a PASS result against the FCC Part 15 Subpart B limits, and the full report was issued on 2025-06-04 under reference number WTH25H05129164E.
- Who conducted the FCC testing for the Air3, and is the lab accredited?
-
Testing was conducted by Waltek Testing Group HCT (Shenzhen) Co., Ltd., a professional EMC and RF testing laboratory located in Shenzhen, Guangdong, China. The lab operates under accreditation relevant to FCC SDoC testing requirements. The report was prepared by Snow Zeng and formally approved by Tony Wu. For accreditation verification or inquiries, the laboratory can be contacted at [email protected] or via their service line at 400-0066-989.
- Does this FCC report cover all markets, or only the United States?
-
Report WTH25H05129164E specifically covers compliance with FCC CFR 47 Part 15 Subpart B, which is a United States federal regulation administered by the Federal Communications Commission. It does not cover CE marking for Europe, KC certification for South Korea, or other regional EMC requirements. Separate compliance documentation would be required for those markets.
Related Documents
The following certification and compliance document types are relevant for a product like the ETENWOLF Air3 Portable Air Pump and may be part of its complete compliance portfolio:
- CE Declaration of Conformity (DoC) – EMC Directive 2014/30/EU: Required for marketing the Air3 in European Union member states. Would cover conducted and radiated emission testing to IEC/CISPR standards.
- CE Declaration of Conformity – Low Voltage Directive 2014/35/EU: Applicable if the Air3 operates above 50V AC or 75V DC, covering electrical safety under relevant IEC standards.
- CE Declaration of Conformity – Machinery Directive 2006/42/EC: May apply given the Air3’s motorized pumping mechanism.
- RoHS Compliance Certificate: Documents restriction of hazardous substances in the Air3’s components under EU RoHS Directive 2011/65/EU.
- REACH Compliance Statement: Confirms that substances of very high concern (SVHCs) in the Air3 are below threshold levels under REACH Regulation (EC) No 1907/2006.
- UN 38.3 Battery Transport Test Report: Required if the Air3 contains a lithium-ion or lithium polymer battery, covering transport safety under UN 38.3 for air, sea, and road shipping compliance.
- KC Certification (Korea Certification): Required for sale in South Korea, covering electromagnetic compatibility and electrical safety standards administered by the National Radio Research Agency (RRA) of Korea.
- PSE Certificate (Japan): Required for electrical products sold in Japan, covering safety standards under the Electrical Appliance and Material Safety Act.
Document Pages

























