ETENWOLF Air3 Inflator Pump Vibration Test Report (ISTA-2A, March 2025)

Document Overview

Key Findings The ETENWOLF Air3 TB1 inflator pump completed a full ISTA-2A vibration test with no functional or cosmetic anomalies detected on either sample unit after testing. Product: Air3 TB1 Inflator Pump (TB1充气泵) Standard: ISTA-2A Report No.: 2025030702 Test Date: 2025-03-07 Sample Quantity: 2 PCS…

Document type
Test Report
Prepared by
Alex Newman
Published
Last reviewed
Topics
Mechanical Reliability

Key Findings

The ETENWOLF Air3 TB1 inflator pump completed a full ISTA-2A vibration test with no functional or cosmetic anomalies detected on either sample unit after testing.

  • Product: Air3 TB1 Inflator Pump (TB1充气泵)
  • Standard: ISTA-2A
  • Report No.: 2025030702
  • Test Date: 2025-03-07
  • Sample Quantity: 2 PCS
  • Environment: Temperature 22 °C, Humidity 55% RH
  • Verdict: Pass

Test Overview

Field Detail
Report Title Vibration Test Report
Report No. 2025030702
Page 1
Date 2025-03-07
Product Name Air3 TB1 Inflator Pump (TB1充气泵)
Manufacturer BTK
Surface Treatment /
Sample Quantity 2 PCS
Test Class / Standard ISTA-2A
Test Reason New Product
Test Objective To verify the resistance of the sample in transportation and use environment.
Laboratory Environment Temperature 22 °C; Humidity 55% RH

Test Equipment & Setup

Item Detail
Instrument Name Vibration Testing Machine (振动试验机)
Test Requirement After testing, product must power on and operate normally
Test Class ISTA-2A
Laboratory Temperature 22 °C
Laboratory Humidity 55% RH

Test Procedure

  1. Pre-test: Record the appearance and functional status of both sample units. Photograph the vibration placement, vibration control chart, and test duration setup.
  2. Placement: Mount the TB1 inflator pump on the vibration testing machine in the specified orientation as shown in the vibration placement photograph.
  3. Vibration Execution: Run the vibration profile in accordance with ISTA-2A parameters, including the programmed frequency sweep and duration as shown in the vibration control chart and test duration record.
  4. Post-test inspection: Remove samples from the test fixture and perform a full visual inspection for cosmetic anomalies (cracks, deformation, loose components).
  5. Functional verification: Power on each sample unit and verify normal operation.
  6. Acceptance Criteria: Product must power on and operate normally after testing; no functional or appearance abnormalities permitted.

Test Data & Results

Stage Observation
Pre-test Samples photographed in vibration placement; vibration control chart and test duration confirmed as set up per ISTA-2A
Post-test — Appearance No abnormalities observed on either sample unit
Post-test — Function Both units powered on and operated normally; no functional anomalies detected

Test Result Statement: After vibration testing, the appearance and function of the samples showed no abnormalities. (测试结果:振动测试后,样品外观功能无异常。)

Conclusion

Item Detail
Judgment Pass (合格)
Standard Applied ISTA-2A
Test Condition Vibration testing machine; 22 °C / 55% RH; product must power on normally after test
Samples Tested 2 PCS — Air3 TB1 Inflator Pump
Verdict ■ Pass   □ Fail   □ Reference

Document Information

Role Name
Approval (核准)
Review / Check (审查) Mai Shaoqiang
Tester (试验人) Zhang Ronggui
Form Number BTK-R-Q-087A/1

Frequently Asked Questions

What standard was used for the Air3 TB1 vibration test?

The test followed the ISTA-2A procedure, which simulates transportation and use environment vibration stresses to verify product mechanical reliability.

What was the acceptance criterion for the Air3 vibration test?

The product must power on and operate normally after the vibration test, with no functional or cosmetic abnormalities. Both sample units passed this criterion.

How many samples were tested in the Air3 TB1 vibration test?

Two production samples (2 PCS) of the Air3 TB1 inflator pump were subjected to the full ISTA-2A vibration profile under laboratory conditions of 22 °C and 55% RH.

Who conducted and reviewed the Air3 vibration test report?

The test was conducted by Zhang Ronggui, reviewed by Mai Shaoqiang, and documented under form number BTK-R-Q-087A/1 on 2025-03-07.