Document Overview
Document Overview This article presents the findings of RoHS compliance test report WTH25X05134195C, issued by Waltek Testing Group (Shenzhen) Co., Ltd. on 2025-06-16. The report covers restricted hazardous substance testing performed in accordance with EU RoHS Directive 2011/65/EU and its amending directive (EU) 2015/863. The…
- Document type
- Certification Report
- Prepared by
- Michelle Torres
- Published
- Last reviewed
- Topics
- Sports & Recreation
Document Overview
This article presents the findings of RoHS compliance test report WTH25X05134195C, issued by Waltek Testing Group (Shenzhen) Co., Ltd. on 2025-06-16. The report covers restricted hazardous substance testing performed in accordance with EU RoHS Directive 2011/65/EU and its amending directive (EU) 2015/863. The scope of testing is to determine whether the 10 restricted substances listed under the RoHS framework are present in the submitted product sample above permissible limits. The overall test conclusion is Pass: all results comply with the requirements of both directives.
| Field | Detail |
|---|---|
| Report Number | WTH25X05134195C |
| Document Type | RoHS Test Report |
| Issuing Laboratory | Waltek Testing Group (Shenzhen) Co., Ltd. |
| Date of Issue | 2025-06-16 |
| Test Conclusion | Pass |
| Applicable Directive | EU RoHS 2011/65/EU and amendment (EU) 2015/863 |
| Sample Receipt Date | 2025-05-27 |
| Testing Period | 2025-05-27 to 2025-06-04 |
Product Information
The tested product is the ETENWOLF P200 Electric Ball Pump, a compact electric inflation device designed for sports balls and similar inflatables. The sample was submitted by and manufactured by Guangdong Bestek Technology Co., Ltd., located at No. 1, North Gaopu 8th Road, Yuancheng Industrial Park, Heyuan City, Guangdong, P.R. China.
| Field | Detail |
|---|---|
| Sample Name | Ball Pump |
| Model Number | P200 |
| Reference Model | NA |
| Brand | ETENWOLF |
| Applicant | Guangdong Bestek Technology Co., Ltd. |
| Manufacturer | Guangdong Bestek Technology Co., Ltd. |
| Manufacturer Address | No. 1, North Gaopu 8th Road, Yuancheng Industrial Park, Heyuan City, Guangdong, P.R. China |
The P200 is constructed from a variety of materials including plastic shells, rubber components, metal hardware, PCB assemblies, wire harnesses, and electronic components — all of which were individually sampled and tested for restricted substances.
Key Details
A total of 68 individual parts and material samples were extracted from the P200 and subjected to XRF screening followed by confirmatory chemical analysis where required. The table below summarises representative results across the primary substance categories. BL = Below Limit, IN = Inconclusive (requiring confirmatory chemical test), ND = Not Detected, NA = Not Applicable.
| Part No. | Part Description | Pb | Cd | Hg | Cr / Cr6+ | Br / PBBs / PBDEs |
|---|---|---|---|---|---|---|
| 1 | Black plastic shell | BL | BL | BL | BL | BL / NA / NA |
| 2 | Black rubber | BL | BL | BL | BL | BL / NA / NA |
| 14 | Silvery metal axle | BL | BL | BL | IN — Cr6+: Negative | NA |
| 21 | Silvery metal sheet ring | BL | BL | BL | IN — Cr6+: Negative | NA |
| 24 | Silvery metal axle | BL | BL | BL | IN — Cr6+: Negative | NA |
| 25 | Coppery metal ring | BL | BL | BL | IN — Cr6+: Negative | NA |
| 46 | Green cladding PCB board (whole) | BL | BL | BL | BL | IN — PBBs: ND, PBDEs: ND |
| 47 | Silvery metal shell | BL | BL | BL | IN — Cr6+: Negative | NA |
| 56 | Silvery metal sheet | BL | BL | BL | IN — Cr6+: Negative | NA |
| 58 | Black cladding PCB board (whole) | BL | BL | BL | BL | IN — PBBs: ND, PBDEs: ND |
| 66 | Black resistance SMD | BL | BL | BL | IN — Cr6+: ND | BL |
All parts where XRF returned an IN (inconclusive) result for total chromium were subsequently confirmed by UV-Vis analysis as Cr6+ Negative or ND. Both PCB assemblies tested inconclusive for bromine by XRF, and both were confirmed PBBs: ND and PBDEs: ND by GC-MS. No part exceeded any RoHS threshold for any of the 10 restricted substances.
The IEC 62321-3-1:2013 XRF screening thresholds applied during testing are summarised below:
| Element | Polymer Warning Value (mg/kg) | Metal Warning Value (mg/kg) | Composite Warning Value (mg/kg) |
|---|---|---|---|
| Cd | BL ≤ (70−3σ) < IN < (130+3σ) ≤ OL | BL ≤ (70−3σ) < IN < (130+3σ) ≤ OL | LOD < IN < (150+3σ) ≤ OL |
| Pb | BL ≤ (700−3σ) < IN < (1300+3σ) ≤ OL | BL ≤ (700−3σ) < IN < (1300+3σ) ≤ OL | BL ≤ (500−3σ) < IN < (1500+3σ) ≤ OL |
| Hg | BL ≤ (700−3σ) < IN < (1300+3σ) ≤ OL | BL ≤ (700−3σ) < IN < (1300+3σ) ≤ OL | BL ≤ (500−3σ) < IN < (1500+3σ) ≤ OL |
| Cr | BL ≤ (700−3σ) < IN | BL ≤ (700−3σ) < IN | BL ≤ (500−3σ) < IN |
| Br | BL ≤ (300−3σ) < IN | Not Regulated | BL ≤ (250−3σ) < IN |
Standards & Compliance
Testing was performed by Waltek Testing Group using internationally recognised IEC standards for each restricted substance category. The methods applied to the P200 are listed below:
| Standard | Scope | Analytical Method |
|---|---|---|
| IEC 62321-3-1:2013 | Screening — Pb, Hg, Cd, total Cr, total Br | X-Ray Fluorescence Spectrometry (XRF / EDXRF) |
| IEC 62321-4:2013+AMD1:2017 CSV | Mercury (Hg) | ICP-OES |
| IEC 62321-5:2013 | Lead (Pb) and Cadmium (Cd) | ICP-OES |
| IEC 62321-7-2:2017 and/or IEC 62321-7-1:2015 | Hexavalent Chromium (Cr6+) | UV-Vis Spectrophotometry |
| IEC 62321-6:2015 | Polybrominated Biphenyls (PBBs) and Polybrominated Diphenyl Ethers (PBDEs) | GC-MS |
| IEC 62321-8:2017 | Phthalates (DEHP, BBP, DBP, DIBP) | GC-MS |
The governing regulatory frameworks are:
- EU RoHS Directive 2011/65/EU — Restriction of Hazardous Substances in Electrical and Electronic Equipment
- Commission Delegated Directive (EU) 2015/863 — Amendment expanding the restricted substances list to include four phthalates (DEHP, BBP, DBP, DIBP)
Validity & Certification Body
The test report was prepared and signed by Hugo Chen on behalf of Waltek Testing Group (Shenzhen) Co., Ltd., an accredited third-party testing laboratory. The report was issued on 2025-06-16 following a testing window of 2025-05-27 to 2025-06-04.
| Field | Detail |
|---|---|
| Report Number | WTH25X05134195C |
| Date of Issue | 2025-06-16 |
| Testing Period | 2025-05-27 to 2025-06-04 |
| Sample Receipt Date | 2025-05-27 |
| Laboratory | Waltek Testing Group (Shenzhen) Co., Ltd. |
| Lab Address | 1/F., Room 101, Building 1, Hongwei Industrial Park, Liuxian 2nd Road, Block 70, Bao’an District, Shenzhen, Guangdong, China |
| Lab Website | http://www.waltek.com.cn |
| Lab Tel | +86-755-33663308 |
| Lab Fax | +86-755-33663309 |
| Lab Email | [email protected] |
| Report Signatory | Hugo Chen, Waltek Testing Group (Shenzhen) Co., Ltd. |
RoHS test reports issued by accredited laboratories do not carry a fixed expiry date in the same way as a certificate, but the findings are specific to the tested sample batch and manufacturing configuration. Any material or design changes to the P200 may necessitate re-testing to maintain valid RoHS compliance documentation.
Frequently Asked Questions
- Does the ETENWOLF P200 comply with the EU RoHS Directive?
-
Yes. The P200 Electric Ball Pump was tested by Waltek Testing Group under report number WTH25X05134195C and achieved a Pass result against both EU RoHS Directive 2011/65/EU and its amendment (EU) 2015/863, covering all 10 restricted substances including the four phthalates added by the 2015 amendment.
- What substances were tested and what were the results?
-
All 68 sampled parts were screened for Lead (Pb), Cadmium (Cd), Mercury (Hg), Hexavalent Chromium (Cr6+), Polybrominated Biphenyls (PBBs), Polybrominated Diphenyl Ethers (PBDEs), and phthalates (DEHP, BBP, DBP, DIBP). All results were confirmed below the applicable RoHS threshold limits. Parts that returned inconclusive (IN) XRF results for total chromium were subsequently confirmed Cr6+ Negative or Not Detected by UV-Vis analysis. Both PCB assemblies were confirmed PBBs ND and PBDEs ND by GC-MS.
- Which testing laboratory conducted the RoHS analysis?
-
Testing was conducted by Waltek Testing Group (Shenzhen) Co., Ltd., an independent accredited third-party laboratory based in Shenzhen, Guangdong, China. The report was signed by Hugo Chen and issued on 2025-06-16. The laboratory can be reached at [email protected] or +86-755-33663308.
- What test methods were used for the P200 RoHS evaluation?
-
The laboratory applied a multi-method approach: IEC 62321-3-1:2013 XRF screening as the primary step, followed by ICP-OES (IEC 62321-4 and 62321-5) for Hg, Pb, and Cd; UV-Vis spectrophotometry (IEC 62321-7-1/7-2) for Cr6+; and GC-MS (IEC 62321-6 and 62321-8) for PBBs, PBDEs, and phthalates. Any part with an inconclusive XRF result was escalated to the appropriate confirmatory chemical method before a final determination was made.
Related Documents
The RoHS test report for the P200 Electric Ball Pump forms one part of a broader compliance documentation set. The following related certification and test report types are relevant for this product category:
- CE Declaration of Conformity — Required for placing the P200 on the EU market; typically references the Low Voltage Directive (LVD 2014/35/EU) and EMC Directive (2014/30/EU) in addition to RoHS.
- FCC Declaration of Conformity — Required for the US market, covering unintentional electromagnetic emissions under FCC Part 15.
- REACH SVHC Compliance Statement — Addresses Substances of Very High Concern under EU REACH Regulation (EC) No 1907/2006, complementing RoHS substance restrictions.
- UN 38.3 Battery Transport Test Report — If the P200 ships with or contains a lithium-ion battery, a UN 38.3 transport safety test report is required for air and sea freight compliance.
- IEC 62133 Battery Safety Test Report — Covers safety requirements for portable sealed secondary lithium cells and batteries used in portable applications.
- KC Certification — Required for the South Korean market, covering electrical safety and EMC requirements administered by the National Radio Research Agency (RRA).
Document Pages

















